Serving the Entire Hunter Region
info@alturademolition.com.au Mon-Fri: 7am - 5pm

Recent Projects

A selection of recent strip out and demolition projects completed for builders, renovators and homeowners across Newcastle, Lake Macquarie and the Hunter Region.

Recently Completed Strip Outs & Demolition

We regularly work alongside local builders, renovators and homeowners to deliver safe, efficient and reliable demolition. Here are a few of our recent projects across the Hunter Region.

01
Bar Beach, NSW

Residential Internal Strip Out & Rear House Demolition

Engaged by a local Newcastle builder in preparation for a major renovation and extension.

The project involved removing all non-structural internal elements — kitchen, bathroom, ceilings, floor coverings and internal linings — before safely demolishing the rear portion of the dwelling. All demolition waste was removed from site and disposed of at approved waste facilities.

Before Bar Beach dwelling before demolition
Rear section demolition at Bar Beach
Rear house demolition underway at Bar Beach
Manual demolition of rear masonry at Bar Beach
After Bar Beach site cleared and ready for the builder

Scope of Works

  • Full internal strip out
  • Kitchen and bathroom demolition
  • Removal of ceilings and floor coverings
  • Demolition of rear section of dwelling
  • Waste removal and disposal
  • Final site clean-up and handover

Outcome

The property was successfully stripped and the rear section demolished, leaving a clean and safe site ready for the builder to commence the next stage of construction.

02
Tighes Hill, NSW

Internal Strip Out, Kitchen & Bathroom Demolition & Partial House Demolition

A residential strip out and partial demolition project completed for a local Newcastle builder as part of renovation and extension works.

Our team carefully stripped out the internal areas of the home, including full demolition of the kitchen and bathroom, before carrying out a controlled partial demolition of the existing structure — ensuring the retained sections remained protected and ready for the next stage.

Kitchen and bathroom strip out at Tighes Hill
After Tighes Hill site cleared after partial demolition
Rear patio and pergola area at Tighes Hill

Scope of Works

  • Full internal strip out of dwelling
  • Complete kitchen demolition and removal
  • Complete bathroom demolition and removal
  • Removal of internal linings, fixtures and fittings
  • Partial demolition of existing house structure
  • Protection of retained structural areas
  • Loading, removal and disposal of all waste materials
  • Final site clean-up and preparation for builder

Outcome

The property was successfully stripped back and partially demolished in line with the builder’s requirements, leaving a clean, safe and accessible site ready for ongoing renovation and construction works.

03
Newcastle, NSW

Commercial Internal Strip Out

Completed for a local Newcastle builder as part of a commercial tenancy refurbishment.

Our team carried out a full internal strip out of the commercial space, carefully removing all non-structural elements while protecting the building structure and services scheduled for retention. The site was then fully cleared and prepared for the incoming fit-out works.

Excavators carrying out commercial internal demolition
Remote demolition robot removing internal brick wall
Workers removing floor tiles during commercial strip out
Internal brick feature wall during strip out
After Commercial tenancy stripped back to a clean open shell
Partial wall removal during commercial strip out

Scope of Works

  • Full commercial internal strip out
  • Removal of partition walls and internal fixtures
  • Ceiling and flooring removal
  • Strip out of fixtures, fittings and joinery
  • Careful protection of retained structural elements
  • Waste sorting, loading and disposal
  • Final commercial site clean and handover preparation

Outcome

The tenancy was fully stripped back to a clean, open shell, ready for the next stage of commercial fit-out. All works were completed safely, efficiently, and in coordination with the builder to meet program requirements.

04
Newcastle, NSW

Concrete Slab Demolition & Site Clean-Up

A series of concrete slab demolition and site clean-up works completed for local Newcastle builders across multiple residential and light commercial projects.

Our team carried out the breaking, removal and disposal of existing concrete slabs, followed by a full clean-up of the affected areas to leave the sites safe, level and ready for the next stage of construction.

Interior with slab and flooring exposed before clean-up
Site cleared with structure prepared during works
After Site fully cleared and levelled ready for new works

Scope of Works

  • Concrete slab demolition and break-up
  • Removal and loading of concrete waste
  • Separation and disposal at approved facilities
  • Grinding and clean-up of remaining debris
  • Site levelling and preparation for new works
  • General site clean-up and final handover

Outcome

All concrete slabs were efficiently removed and the sites left clean and prepared for upcoming building works. The projects were completed on schedule with minimal disruption to surrounding trades and ongoing site activity.

Have a Strip Out or Demolition Coming Up?

From a single bathroom strip to a full house demolition, we'd be glad to help. Get in touch for a free, no-obligation quote.